Estimation involved time trend
Moderators: EViews Gareth, EViews Moderator, EViews Jason, EViews Matt
Estimation involved time trend
Hi, I have a question regarding to the estimation involving a time trend.
Let say I had estimated an equation and obtained all the coefficients of the variables such as:
equation.ls y c @trend y(-1)
Coefficients obtained: 0.3 for c; 0.5 for @trend; 1.2 for y(-1).
Now if I want to generate a series based on my estimated coefficients by specifying the equation as
y = 0.3 + 0.5*@trend + 1.2*y(-1).
Unfortunately, the eviews doesn't allow me to generate the series (or observation) mentioned that @trend is a reserved term.
My question is, if I want to generate observation based on my estimated equation, how should I specify in the equation, given that the coefficients information.
Let say I had estimated an equation and obtained all the coefficients of the variables such as:
equation.ls y c @trend y(-1)
Coefficients obtained: 0.3 for c; 0.5 for @trend; 1.2 for y(-1).
Now if I want to generate a series based on my estimated coefficients by specifying the equation as
y = 0.3 + 0.5*@trend + 1.2*y(-1).
Unfortunately, the eviews doesn't allow me to generate the series (or observation) mentioned that @trend is a reserved term.
My question is, if I want to generate observation based on my estimated equation, how should I specify in the equation, given that the coefficients information.
-
startz
- Non-normality and collinearity are NOT problems!
- Posts: 3796
- Joined: Wed Sep 17, 2008 2:25 pm
Re: Estimation involved time trend
That command is perfectly legal in EViews. So there must be something else funky going on. Exactly what did you type and what error message did you get?Now if I want to generate a series based on my estimated coefficients by specifying the equation as
y = 0.3 + 0.5*@trend + 1.2*y(-1).
Unfortunately, the eviews doesn't allow me to generate the series (or observation) mentioned that @trend is a reserved term.
Re: Estimation involved time trend
Hi thank you for your reply.
Actually I am writing a program to help me generate series after I estimated an equation. I am working in this way:
First, I estimate an equation named "Equation" involved a constant, time trend and its lagged variable using least square:
Equation.ls y c @trend y(-1)
After I estimated and obtained the estimated coefficients such as
0.3 for c
0.5 for @trend
1.2 for y(-1)
and I save it.
Next, I try to generate series based on the information above:
for !i=1 to 50
y(!i) = 0.3 + 0.5*@trend + 1.2*y(!i-1)
next
But when come to this step, I was stopped by the program and telling me that @trend is a reserve term. Then I'm wondering am I wrong in the equation specification and thinking is there any other way for me to generate the series. Hope that my problem is clear for you now.
Actually I am writing a program to help me generate series after I estimated an equation. I am working in this way:
First, I estimate an equation named "Equation" involved a constant, time trend and its lagged variable using least square:
Equation.ls y c @trend y(-1)
After I estimated and obtained the estimated coefficients such as
0.3 for c
0.5 for @trend
1.2 for y(-1)
and I save it.
Next, I try to generate series based on the information above:
for !i=1 to 50
y(!i) = 0.3 + 0.5*@trend + 1.2*y(!i-1)
next
But when come to this step, I was stopped by the program and telling me that @trend is a reserve term. Then I'm wondering am I wrong in the equation specification and thinking is there any other way for me to generate the series. Hope that my problem is clear for you now.
-
EViews Gareth
- Fe ddaethom, fe welon, fe amcangyfrifon
- Posts: 13586
- Joined: Tue Sep 16, 2008 5:38 pm
Re: Estimation involved time trend
As Startz mentioned, it is a perfectly legal command. Something else is going on. Post your entire program.
Re: Estimation involved time trend
Hi, below is my simple program. The program couldn't complete due to the problem I mentioned. Hope that you can help to resolve my problem. Thanks.
workfile test u 1000
series y = nrnd
series x = 0
equation estimate.ls y c @trend y(-1)
vector(3) coef
for !i=1 to 3
coef(!i) = estimate.@coefs(!i)
next
x(1) = y(1)
for !ic=2 to 1000
x(!ic) = coef(1) + coef(2)*@trend + x(!ic-1)
next
workfile test u 1000
series y = nrnd
series x = 0
equation estimate.ls y c @trend y(-1)
vector(3) coef
for !i=1 to 3
coef(!i) = estimate.@coefs(!i)
next
x(1) = y(1)
for !ic=2 to 1000
x(!ic) = coef(1) + coef(2)*@trend + x(!ic-1)
next
-
EViews Gareth
- Fe ddaethom, fe welon, fe amcangyfrifon
- Posts: 13586
- Joined: Tue Sep 16, 2008 5:38 pm
Re: Estimation involved time trend
You're working element by element inside your loop, but you're not accessing an element of @trend.
I think you just want:
Or, to make it much simpler:
I think you just want:
Code: Select all
workfile test u 1000
series y = nrnd
series x = 0
equation estimate.ls y c @trend y(-1)
vector(3) coef
for !i=1 to 3
coef(!i) = estimate.@coefs(!i)
next
x(1) = y(1)
smpl 2 1000
x = coef(1) + coef(2)*@trend + x(-1)
Or, to make it much simpler:
Code: Select all
workfile test u 1000
series y = nrnd
series x
equation estimate.ls y c @trend y(-1)
x(1) = y(1)
smpl 2 1000
x = estimate.@coef(1) + estimate.@coef(2)*@trend + estimate.@coef(3)*x(-1)
Re: Estimation involved time trend
Thank you for your prompt. May I know is there possible to compile the series by generating its observation one by one using loop? This is because I intend to generate the series recursively in my program.
Example:
Given y = series y; x = series x; resids_y = residual y; resids_x = residual x
for !i=1 to 100
dy(!i) = coef(1) + coef(2)*@trend + coef(3)*y(!i-1) + coef(4)*x(!i-1) + resids_y
dx(!i) = coef1(1) + coef1(2)*@trend + coef1(3)*y(!i-1) + coef1(4)*x(!i-1) + resids_x
y(!i) = dy(!i) + y(!i-1)
x(!i) = dx(!i) + x(!i-1)
next
I need to generate the observation one by one in order to generate the series y and x properly.
Example:
Given y = series y; x = series x; resids_y = residual y; resids_x = residual x
for !i=1 to 100
dy(!i) = coef(1) + coef(2)*@trend + coef(3)*y(!i-1) + coef(4)*x(!i-1) + resids_y
dx(!i) = coef1(1) + coef1(2)*@trend + coef1(3)*y(!i-1) + coef1(4)*x(!i-1) + resids_x
y(!i) = dy(!i) + y(!i-1)
x(!i) = dx(!i) + x(!i-1)
next
I need to generate the observation one by one in order to generate the series y and x properly.
-
EViews Gareth
- Fe ddaethom, fe welon, fe amcangyfrifon
- Posts: 13586
- Joined: Tue Sep 16, 2008 5:38 pm
Re: Estimation involved time trend
I don't understand why you need a loop.
Re: Estimation involved time trend
Hi Gareth, because in the generation of series y there is a cross over with series x. In order to get the observation y, we need to first generate the ith observation of dy then only can generate ith observation of y. So in the generating process, I have to complete the whole process in order to get the ith observation.
Example for the program 1:
workfile test1 u 100
rndseed 12345
series resid_y = nrnd
series resid_x = nrnd
series y = 0
series x = 0
series dy = 0
series dx = 0
smpl 2 100
dy = y(-1) + x(-1) + resid_y
dx = y(-1) + x(-1) + resid_x
y = dy + y(-1)
x = dx + x(-1)
is different with the program 2:
workfile test2 u 100
rndseed 12345
series resid_y = nrnd
series resid_x = nrnd
series y = 0
series x = 0
series dy = 0
series dx = 0
for !i = 2 to 100
dy(!i) = y(!i-1) + x(!i-1) + resid_y(!i)
dx(!i) = y(!i-1) + x(!i-1) + resid_x(!i)
y(!i) = dy(!i) + y(!i-1)
x(!i) = dx(!i) + x(!i-1)
next
Both will generate different values for series y and x. Hope that you get my concerns and what I wanted to express. Thanks.
Example for the program 1:
workfile test1 u 100
rndseed 12345
series resid_y = nrnd
series resid_x = nrnd
series y = 0
series x = 0
series dy = 0
series dx = 0
smpl 2 100
dy = y(-1) + x(-1) + resid_y
dx = y(-1) + x(-1) + resid_x
y = dy + y(-1)
x = dx + x(-1)
is different with the program 2:
workfile test2 u 100
rndseed 12345
series resid_y = nrnd
series resid_x = nrnd
series y = 0
series x = 0
series dy = 0
series dx = 0
for !i = 2 to 100
dy(!i) = y(!i-1) + x(!i-1) + resid_y(!i)
dx(!i) = y(!i-1) + x(!i-1) + resid_x(!i)
y(!i) = dy(!i) + y(!i-1)
x(!i) = dx(!i) + x(!i-1)
next
Both will generate different values for series y and x. Hope that you get my concerns and what I wanted to express. Thanks.
-
EViews Gareth
- Fe ddaethom, fe welon, fe amcangyfrifon
- Posts: 13586
- Joined: Tue Sep 16, 2008 5:38 pm
-
EViews Glenn
- EViews Developer
- Posts: 2682
- Joined: Wed Oct 15, 2008 9:17 am
Re: Estimation involved time trend
Simultaneous generation of several dynamic series is one of the things for which the model object is built:
Note that you can simplify the computation (at the expense of clarity) by folding the dy and dx equations into the y and x generating equations.
Code: Select all
workfile test3 u 100
rndseed 12345
series resid_y = nrnd
series resid_x = nrnd
series y = 0
series x = 0
model a
a.append dy = y(-1) + x(-1) + resid_y
a.append dx = y(-1) + x(-1) + resid_x
a.append y = dy + y(-1)
a.append x = dx + x(-1)
a.scenario "actuals"
a.solve
Re: Estimation involved time trend
Ok, I got it now. Thanks lot for your efforts!