Hi all,
Is forecasting in EViews done via clicking "Forecast" in Equation?
I have a workfile with the following dependent and independent variables, with sample date 2000m1 to 2012m07
"Actual" - this is the dependent variable
"W" - this is one of the independent variable
"X" - this is one of the independent variable
"Y" - this is one of the independent variable
"Z" - this is one of the independent variable
What I want to do is to estimate "Actual" 3 data points past the workfile sample date range.
Do I do this:
Import all data > select all data except the dates and open as an equation:
actual w x y z c
Method: LS, Sample: 2000m01 2012m07
Once the equation is created, I clicked on "Forecast", which pops open a window. Now, what do I do? Since my workfile's date range stops at 2012m07, do I need to create my own projected independent variables (w, x, y, z, c) and future observation dates in order for this to work?
Right now the forecast just forecasts over existing observation dates.
Thanks!
Victor
Forecasting = Click on "Forecast" in Equation?
Moderators: EViews Gareth, EViews Moderator
-
EViews Gareth
- Fe ddaethom, fe welon, fe amcangyfrifon
- Posts: 13604
- Joined: Tue Sep 16, 2008 5:38 pm
Re: Forecasting = Click on "Forecast" in Equation?
Yes, forecasting is done via clicking on the "Forecast" button.
Yes, you can only forecast for dates/observations that are currently in your workfile. Thus you'll need to add extra dates to your workfile if you want to forecast outside of the current workfile range. You can add dates by clicking on Proc->Structure/Resize current page, and then changing the end date / number of observations.
Yes, you can only forecast for a dependent variable if data for the independent variables exists. Thus you will need to provide data for your independent variables. Note you do not need to provide data for "C"
Yes, you can only forecast for dates/observations that are currently in your workfile. Thus you'll need to add extra dates to your workfile if you want to forecast outside of the current workfile range. You can add dates by clicking on Proc->Structure/Resize current page, and then changing the end date / number of observations.
Yes, you can only forecast for a dependent variable if data for the independent variables exists. Thus you will need to provide data for your independent variables. Note you do not need to provide data for "C"
Re: Forecasting = Click on "Forecast" in Equation?
Thanks! Got it to work.
I just noticed that the forecast is based on the fitted (green) line instead of the actual line. Is there a way to forecast projections off the actual dependent variable observations? It makes sense to forecast a projection off the current data, since the data is accepted as "correct".
Fitted vs Actual: Forecast extends off the Fitted line instead of the actual line
I just noticed that the forecast is based on the fitted (green) line instead of the actual line. Is there a way to forecast projections off the actual dependent variable observations? It makes sense to forecast a projection off the current data, since the data is accepted as "correct".
Fitted vs Actual: Forecast extends off the Fitted line instead of the actual line
-
startz
- Non-normality and collinearity are NOT problems!
- Posts: 3797
- Joined: Wed Sep 17, 2008 2:25 pm
Re: Forecasting = Click on "Forecast" in Equation?
Well if you know the value of the variable you're trying to forecast, why not just use that value as the forecast? 
-
EViews Gareth
- Fe ddaethom, fe welon, fe amcangyfrifon
- Posts: 13604
- Joined: Tue Sep 16, 2008 5:38 pm
Re: Forecasting = Click on "Forecast" in Equation?
The forecast will use actual data for all periods prior to the forecast period. Change the forecast sample to start at the end of the estimation sample, rather than at the start of the estimation sample.
Re: Forecasting = Click on "Forecast" in Equation?
Thanks! Changing the forecast sample to start at the end of the estimation sample worked!
I then saved the forecast and graphed it along with the dependent variable to construct the "Actual + Forecast" graph
I then saved the forecast and graphed it along with the dependent variable to construct the "Actual + Forecast" graph
-
jasonleewkd
- Posts: 5
- Joined: Mon Dec 16, 2013 8:42 pm
Re: Forecasting = Click on "Forecast" in Equation?
Hi, if I may follow on the question from the OP.
I changed the forecast sample period to start from the end of the estimation sample, and end at a desired point but the graph does not show the historical (actual) values up to the end of the estimation sample, followed by the forecast values.
Am I missing something? :?
Some stats for info Jason
I changed the forecast sample period to start from the end of the estimation sample, and end at a desired point but the graph does not show the historical (actual) values up to the end of the estimation sample, followed by the forecast values.
Am I missing something? :?
Some stats for info Jason
-
EViews Gareth
- Fe ddaethom, fe welon, fe amcangyfrifon
- Posts: 13604
- Joined: Tue Sep 16, 2008 5:38 pm
Re: Forecasting = Click on "Forecast" in Equation?
Your first picture indicates that the forecast sample was 1-76, which is, I'm guessing, the entire workfile range.
-
jasonleewkd
- Posts: 5
- Joined: Mon Dec 16, 2013 8:42 pm
Re: Forecasting = Click on "Forecast" in Equation?
Hi Gareth, this might be what I'm trying to achieve. The red line is the actual historical data and the blue line is the forecasted. Is it possible, and if so, how?
Jason
Jason
-
EViews Gareth
- Fe ddaethom, fe welon, fe amcangyfrifon
- Posts: 13604
- Joined: Tue Sep 16, 2008 5:38 pm
Re: Forecasting = Click on "Forecast" in Equation?
Set the forecast sample
Who is online