Control procedure
Posted: Mon Oct 03, 2011 10:32 am
In my model, actuals for different variables end at different dates. To handle the uneven end dates for actuals, I have used the "actexist=t" option with the exclude procedure, and I have set my forecast period to start at the earliest date where endogenous actuals do not exist.
Using my forecast date range, I am trying to use a control procedure to back out an add factor for one of my endogenous variables. Since my model is supposed to exclude actuals where they exist, I had assumed that the control procedure would not produce an add factor in history - however, it does. This is causing the forecast of the endogenous variable to deviate from the target trajectory.
I can't figure out how to get the control procedure to incorporate the model's "exclude" settings.
I'm using version 7.2 Enterprise Edition.
Using my forecast date range, I am trying to use a control procedure to back out an add factor for one of my endogenous variables. Since my model is supposed to exclude actuals where they exist, I had assumed that the control procedure would not produce an add factor in history - however, it does. This is causing the forecast of the endogenous variable to deviate from the target trajectory.
I can't figure out how to get the control procedure to incorporate the model's "exclude" settings.
I'm using version 7.2 Enterprise Edition.