I cant estimate Arrelano and Bond AR(1&2) in System GMM
Posted: Sat Oct 24, 2020 1:33 pm
Hello everyone,
Please i have a panel dataset of N= 72 firms collected over 10 yrs (T = 10) to estimate a Dynamic Panel Model (DPM) with one lag of dependent variables. I want to estimate the GMM model and also test for Arrelano and Bond AR(1) and AR(2).
The Equation object created and use in the command window is:
EQUATION OMOEQ.GMM(CX=OD,PER=F,COV=PERWHITE,GMM=PERWHITE,ITER=ONEB,LEVELPER) LEV LEV(-1) FSIZE ATG GOPT PRFTY ESIZE EPVTY ECNDN INFR PINST @ @DYN(LEV,-2, -6) FSIZE(-1) ATG(-1) GOPT(-1) PRFTY(-1) ESIZE(-1) EPVTY(-1) ECNDN(-1) INFR(-1) PINST(-1)
OMOEQ.ABTEST
Pls the first two lines gave me the GMM output but cannot find the Arrelano and Bond serial correlation (execept only Histogram-Normality Test) under the Residual Diagnostic Test located under View menu.
Eviews Tutorial recommended the Abtest equation(As in 3rd line in the above equation). But whenever i Add the OMOEQ.ABTEST it shows "ABTEST is not valid view for OMOEQ" error msg
Where:
OMOEQ is the equation variable i created. And am using Eviews 7.
Please your swift help and response will be deeply appreciated. i have been on this trap for 2 weeks.
Thanks
Please i have a panel dataset of N= 72 firms collected over 10 yrs (T = 10) to estimate a Dynamic Panel Model (DPM) with one lag of dependent variables. I want to estimate the GMM model and also test for Arrelano and Bond AR(1) and AR(2).
The Equation object created and use in the command window is:
EQUATION OMOEQ.GMM(CX=OD,PER=F,COV=PERWHITE,GMM=PERWHITE,ITER=ONEB,LEVELPER) LEV LEV(-1) FSIZE ATG GOPT PRFTY ESIZE EPVTY ECNDN INFR PINST @ @DYN(LEV,-2, -6) FSIZE(-1) ATG(-1) GOPT(-1) PRFTY(-1) ESIZE(-1) EPVTY(-1) ECNDN(-1) INFR(-1) PINST(-1)
OMOEQ.ABTEST
Pls the first two lines gave me the GMM output but cannot find the Arrelano and Bond serial correlation (execept only Histogram-Normality Test) under the Residual Diagnostic Test located under View menu.
Eviews Tutorial recommended the Abtest equation(As in 3rd line in the above equation). But whenever i Add the OMOEQ.ABTEST it shows "ABTEST is not valid view for OMOEQ" error msg
Where:
OMOEQ is the equation variable i created. And am using Eviews 7.
Please your swift help and response will be deeply appreciated. i have been on this trap for 2 weeks.
Thanks