Run a VAR with trend
Posted: Thu Aug 23, 2018 10:30 am
Hello,
Im trying to run a VAR with a linear and a quadratic term in time in each of the equations of the VAR. Is this specification correct? when I add a trend it is considered as a exogenous variable?
var var1.ls 1 2 taxes_d gc_d gdp_d @ c dum_75 dum_75(-4) @trend @trend^2
Thanks,
Luciana
Im trying to run a VAR with a linear and a quadratic term in time in each of the equations of the VAR. Is this specification correct? when I add a trend it is considered as a exogenous variable?
var var1.ls 1 2 taxes_d gc_d gdp_d @ c dum_75 dum_75(-4) @trend @trend^2
Thanks,
Luciana