Page 1 of 1

ARMA-GARCH model with dummy variables for structural break?

Posted: Sun Apr 17, 2022 5:45 pm
by AgentRose
Hi, I have identified an ARMA model (1,2) but I was wondering whether it is possible to include a dummy variable for a structural break on Eviews, and how would you forecast it?

How would you go about doing it?