Page 1 of 1

arma-garch-M

Posted: Fri Apr 19, 2019 4:49 am
by jmanuel
How can I estimate an ARMA(p,q)-GARCH-M" model in which the term Std Dev (or the variance) in the mean is (t-1) instead of being contemporary (t)?
Thanks